01 / 05
Built Fast
100% workshop fabricated, with an estimated production time of 14–21 working days.
02 / 05
Portable
The unit can be easily relocated using a crane and Fuso truck to adapt to changing needs.
03 / 05
Fixed Cost
Fixed pricing based on the agreed contract and final budget estimate, with no unexpected costs during construction.
04 / 05
Robust Structure
Built with a Grade A Corten steel container body and a galvanized steel reinforcing frame.
05 / 05
Move in Ready
Pad foundation, electrical and water connections all set and ready for use.